• Owner: Farab Co.
  • Consultant: Moshanir Co.
  • Site Location: Khoozestan
  • Contract Period: 12 Months
  • Capacity (MW): 1000 MW
  • Project Status: Completed in 2003
  • Scope of Work: Installation & Commissioning of the B.O.P Equipment, consist of Electrical, Mechanical, I&C Equipment.