Tabas TPP Project (B.O.P Section)

  • Owner: I.P.D.C
  • Plant Type: Coal-fired
  • Site Location: Tabas
  • Capacity (MW): 650 (2*325)
  • Progress: 65%
  • Scope of Work: Engineering, Procurement, Construction & Commissioning of 2*35000 m3 mazut, 2*2500 m3 gasoil, 2*1000 m3 demineralized water, 1000 m3 permeate storage tanks and other sections of B.O.P Power Plant.

Mofateh TPP Project

  • Owner: I.P.D.C
  • Plant Type: STG
  • Site Location: Hamedan
  • Capacity (MW): 1,000 (4*250)
  • Progress: Completed in 1996
  • Scope of Work: Installation of auxiliary systems (consist of cooling towers , aux. boiler, make up system, water treatment plant, gasoil and gas stations, diesel generators, aux. services, …), installation of Medium Voltage Substations, 6 KV & 400 V switchgears, installation of DC/UPS system and control panels, Central Control Rooms (CCR), cabling and wiring, earth system, installation of measuring & control Systems.